How Long Does It Take to Install Solar Panels?

For project developers, property managers and installers, the installation time for solar panels is a crucial factor in project planning. A realistic estimate of how long it takes to install solar panels prevents costly delays and helps to coordinate schedules, contracts and handover dates. Yet in practice, this aspect is regularly underestimated, particularly in the case of large-scale commercial rooftop installations generating tens or even hundreds of kilowatts of power.

The installation time for solar panels varies considerably depending on the type of project, the panels chosen and the preparatory work carried out beforehand. This article discusses the key factors, stages and pitfalls, so that professionals can plan and carry out their projects more efficiently.

Factors that determine installation time

The total lead time for a solar panel installation is determined by a combination of technical, logistical and administrative factors. Every project is unique, but there are a number of variables that almost always have a significant impact on the time required.

The roof structure and roof type play a major role. A flat roof requires different mounting systems to a pitched roof, and the load-bearing capacity of the roof structure helps to determine which panels are suitable and how the mounting structure is designed. Also, the system size is a key factor: a 100 kWp installation takes considerably longer than a 20 kWp system, not only in terms of installation time but also in terms of cabling, connection and commissioning.

In addition, there are permits and grid connections are often the biggest time-consuming factors apart from the actual installation. Depending on the local authority and the network operator, the lead time for obtaining a permit and a feed-in connection can vary from a few weeks to several months. Finally, the availability of installers and the lead time for materials determine how much flexibility there is in the schedule.

Installation times for large-scale commercial projects

At commercial rooftop installations In the case of commercial premises, logistics centres and distribution centres, the systems are almost always rated at 100 kilowatts or more. The physical installation time on the roof for such projects usually ranges from several days to a few weeks, depending on the size of the system and the number of fitters deployed.

An installation of 200 to 500 kWp on a large commercial roof takes an experienced installation team an average of five to fifteen working days to complete the actual fitting. On top of this is the time required for laying cables, installing inverters and connecting to the electricity grid. In practice, the total project lead time – including preparation, planning permission and grid connection – can easily run to between two and six months.

For projects involving several buildings or sites at the same time, a phased approach is common. This enables contractors to work in parallel and reduce the overall project duration, provided that logistics and the supply of materials are well co-ordinated.

The installation stages, step by step

A professional rooftop solar panel installation takes place in clearly defined stages. Understanding these steps helps clients and installers to draw up realistic timelines and identify potential issues at an early stage.

Preparation and engineering

The first phase involves the technical preparations: roof inspection, structural calculations, system design and applying for the necessary permits. This phase usually takes between two and eight weeks and depends heavily on the complexity of the roof and the response times of the local authority and the grid operator.

Material supply and logistics

Once the design has been approved, materials are ordered and scheduled for delivery. Delivery times for panels, inverters and cabling vary depending on the supplier. For panels manufactured in Europe, such as those from Solarge’s production facility in Weert, transport distances are short and delivery times are predictable, which helps to ensure more stable project planning.

Roof installation

The actual installation begins with fitting the substructure or mounting rails, followed by the installation of the panels themselves. Next, the electrical connections are made and the inverters and safety components are fitted. This phase is labour-intensive but can be planned effectively if the preparatory work is thorough.

Connection and commissioning

The final stage involves the grid connection by the grid operator and the official commissioning of the system. Once approved and inspected, the installation is operational. Depending on the grid operator’s waiting times, this may still take a few weeks after installation has been completed.

Common mistakes that delay installation

Delays in the installation of solar panels can often be avoided. However, a number of recurring mistakes lead to unnecessary delays in the schedule time and time again.

One of the most common causes is insufficient preliminary roof inspection. If, during installation, it becomes apparent that the roof structure does not meet the load-bearing requirements, or that the roofing needs to be replaced, the project will be delayed immediately. A thorough roof inspection during the preparatory phase prevents this.

Another common mistake is to late applications for licences and grid connections. As these processes lie outside the installer’s direct control, it is essential to start early. Anyone who only submits an application after the materials have been delivered risks the installation being complete but the system being unable to be commissioned for weeks or months.

Finally, this leads to poor coordination between the parties, such as between the project developer, the installer and the supplier, regularly leads to delays and miscommunication. A clear project structure with designated points of contact and clear milestones prevents this sort of delay.

Faster installation with the right choice of panels

The choice of solar panel type has a direct impact on the installation time. Traditional glass modules are heavy, fragile and require robust mounting structures that take extra time to install. Lightweight alternatives offer a clear advantage in this respect.

The lightweight solar panels Solarge’s modules, such as the SOLO and SOLO Ultra Low Carbon, weigh 50% less than conventional glass modules. This has several practical implications for the speed of installation. Panels can be carried and installed by fewer people, roof installation is quicker, and less heavy-duty mounting infrastructure is required. In practice, this means that installers can work up to 50% faster compared with traditional panels, resulting in significant time savings on large-scale projects.

Furthermore, lightweight panels are suitable for roofs that cannot support the load of heavy glass modules without first requiring costly roof reinforcement. This opens up the possibility of carrying out projects that would otherwise be technically unfeasible, or that would require a longer preparation phase. For project developers and installers working to tight deadlines, this is an important consideration when selecting panels.

Anyone who wants to get serious about achieving efficiency commercial solar panel installation, would be well advised to consider, as early as the design phase, the impact of the choice of panels on the overall project duration. The right panels, combined with thorough preparation and timely planning applications, form the basis for an installation that is completed on time and within budget.

Want to know more about this blog?

If you have any questions about the blog or
want to know more? Feel free to get in touch.

Get in touch

Insights into circular solar energy

Stay informed about innovations, research developments, and practical experience within circular solar energy for real estate, industry, and government.